翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Columbus (spacecraft) : ウィキペディア英語版
Columbus Man-Tended Free Flyer

The ''Columbus'' Man-Tended Free Flyer (MTFF) was a European Space Agency (ESA) program to develop a space station that could be used for a variety of microgravity experiments while serving ESA's needs for an autonomous manned space platform (for an image, see (here )). It consisted of a Columbus module docked to a service module containing solar power collectors, communications and other services. The program ran from 1986 to 1991, was expected to cost $3.56 billion including launch and utilization, and was cancelled while still in the planning stage. Aspects of the program were later realised in the ''Columbus'' science laboratory attached to the International Space Station (ISS).
==History==
ESA's Board of Directors approved the Columbus program in 1985. Like the ''Multi-Purpose Logistics Modules'' (MPLMs) and the ''Automated Transfer Vehicle'' (ATV) resupply craft, Columbus traces its origins to ''Spacelab''. The Columbus program was intended to supplement NASA's Space Station Freedom.
Initially the Columbus program included three flight configurations:
* A ''Man-tended Free-Flyer'' (MTFF) space station element
* An ''Attached Pressurized Module'' (APM) manned component
* An unmanned ''Polar Platform'' (PPF) for remote sensing
The entire Columbus package (MTFF, APM, PPF) was expected to cost $3.56 billion including launch and utilization. The estimated costs of the MTFF alone were $160–180 million in 1986.〔 The MTFF element would be serviced by the ''Hermes'' mini-shuttle launched atop the ''Ariane 5'', flying periodically to the station for maintenance and reconfiguration. NASA approved the MTFF although it would require additional communications, docking facilities, data processing and other Station resources. Hermes would dock with the man-tended free-flyer to retrieve microgravity experiments.〔
Since the initial plans, numerous studies and proposals were made. For development cost saving and optimization of spares provisioning during the operational phase commonality was foreseen between the flight configurations and to the space station (e.g. same computers used for all three elements, video and comms units identical to station equipment). When the complete phase C/D proposal (fixed price) was delivered end 1989 by the prime contractor MBB-ERNO it turned out that the costs were much higher than expected by ESA. The Columbus budget was trimmed slightly by canceling the smaller $145-million Eureca B platform. Hermes and Columbus would receive final approval in 1991. By this time, the cost of German unification had forced Germany to demand a 15-20% reduction in ESA 1990-2000 spending and it was becoming increasingly clear either the German-led MTFF, Italian-led APM or French-led Hermes projects would have to be cancelled.〔 After several budget cuts, the CNES-led Hermes program was cancelled and the polar platform was contracted separately with commonality to the French satellite ''Helios''.
All that remained in the Columbus program was the APM, which was first renamed to "Columbus Orbital Facility" and later to just "Columbus". It would later be redesigned to fit with the International Space Station (ISS). When only the APM was left in ESA's Columbus program, there were not enough tasks for the two main contributors Germany and Italy represented by MBB-ERNO and Alenia respectively. As compromise the ''Pre Integrated Columbus APM'' (PICA) - principle was invented meaning a split systems engineering responsibility where Alenia as a co-prime is responsible for the overall Columbus configuration, the mechanical and thermal/life support systems, HFE and harness design/manufacturing whereas EADS Astrium Space Transportation is responsible for the overall Columbus design and all Avionics systems including electrical harness design and software.〔''MBB-ERNO'' was renamed ''Deutsche Aerospace'', then ''Daimler-Benz Aerospace'', then ''DaimlerChrysler Aerospace'', then ''Astrium'', then ''EADS SPACE Transportation'' and finally ''EADS Astrium Space Transportation''.〕 Splitting off systems engineering responsibility and harness design under separate fixed-price contracts was found not to be advantageous with respect to efficiency and fast decision making as financial reasonings were pre-dominant in the last phase of development and verification.
ESA's Columbus module for the International Space Station (ISS) was based on the APM. It was eventually launched aboard Space Shuttle ''Atlantis'' on February 7, 2008 on flight STS-122.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Columbus Man-Tended Free Flyer」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.